Subscribe to our mailing list

e-mail Format

Kadikechi

Many people gathered at the site as the pump was being installed for the first time. The villagers were impressed with how the pump works and expressed their gratitude to the organisation for prioritising the lives of poor communities. The installation process was completed successfully.

However, due to climate change, agricultural production has declined over the years, leaving many villagers in poverty. High rates of waterborne diseases have also been a significant problem in the area, but with the installation of the pump, the villagers are hopeful that such illnesses will no longer affect them. Additionally, some individuals suffer from malnutrition due to food shortages.

Date of Installation

2024-12-05

Area

Chiseng'ezi

District

Mzimba

GPS

-11.709920, 33.388730     see on map

Pump no.

24122

Dist. from Factory (km)

169.0

Village Head / Group Village Head

Yakhobe Gama

Contact (phone no.)

0983746498

Previous Water Source

Open well

Installation Type

new

Well Depth (m)

6.74

Water Depth (m)

1.02

Pump Length (m)

6.54

Dist. from Furthest Household (m)

397

No. of People Served

126

Pump Dedication / Donor

CO’Reilly Narcissips
Ireland