Subscribe to our mailing list

e-mail Format

Mpamira

The pump installation was completed successfully. Many people gathered to learn how to use the pump correctly to ensure its longevity. Since the pump is installed near a busy road, it will be accessible to many people. Previously, when the villagers needed clean water, they had to walk long distances to a borehole and pay for a bucket of water. If they didn't have money, they were not allowed to draw water. Now, they are extremely happy to have their own pump right in the village.

Date of Installation

2024-10-01

Area

Kamphulu

District

Kasungu

GPS

-13.255520, 33.466327     see on map

Pump no.

24110

Dist. from Factory (km)

296.0

Village Head / Group Village Head

Mbeta

Contact (phone no.)

0994007937

Previous Water Source

Open well

Installation Type

new

Well Depth (m)

8.34

Water Depth (m)

1.59

Pump Length (m)

8.14

Dist. from Furthest Household (m)

524

No. of People Served

162

Pump Dedication / Donor

CO’Reilly Narcissips
Ireland