Subscribe to our mailing list

e-mail Format

Masiteki Phiri

The village was filled with happiness when they saw the pump installed and they thanked the organisation for the help.

Many of the villagers are farmers and spend most of their time in the fields. More crops are grown in the area. There are no good roads to the village. Little vegetation can be seen in the village and they ask for tree seeds so that all bare should be planted with trees.


powered by

HireVibes

Date of Installation

2021-06-30

Area

Kaviyombo

District

Mzimba

GPS

-11.387023, 33.462861     see on map

Pump no.

21170

Dist. from Factory (km)

98.0

Village Head / Group Village Head

Yakobe

Contact (phone no.)

0882733871

Previous Water Source

Pond

Installation Type

New

Well Depth (m)

6.94

Water Depth (m)

1.52

Pump Length (m)

6.74

Dist. from Furthest Household (m)

621

No. of People Served

460

Pump Dedication / Donor

HireVibes