Subscribe to our mailing list

e-mail Format

Kanyunya

The pump was pump was well fixed and the place looks good. The pump is pumping well. Women in village said that they are happy because before they were using a rope and a bucket to draw water which was very tiresome and now it is very easy to draw water because they will just be pumping.

The place is very far from the major trading centre and they have problems to sell their farm produce where the time is due. Roads are too bad to go to the village. People in the village requested for tree seeds.


powered by

Energy Web

Date of Installation

2021-06-29

Area

Yakuwata

District

Mzimba

GPS

-11.372478, 33.431477     see on map

Pump no.

21167

Dist. from Factory (km)

121.0

Village Head / Group Village Head

Chigowo Nyirenda

Contact (phone no.)

0884337651

Previous Water Source

Open well

Installation Type

New

Well Depth (m)

7.58

Water Depth (m)

2.1

Pump Length (m)

7.38

Dist. from Furthest Household (m)

296

No. of People Served

500

Pump Dedication / Donor

HireVibes