Subscribe to our mailing list

e-mail Format

Chimphonje

The village is very thankful for the pump  installed .Some villagers has dug wells in their homes but it was risky to their children, now having a covered well with a pump installed they are very thankful.

Date of Installation

2018-10-22

Area

Mawawa

District

Kasungu

GPS

-13.111039, 33.362202     see on map

Pump no.

18132

Dist. from Factory (km)

252

Village Head / Group Village Head

Galuwawo

Contact (phone no.)

0882513667

Previous Water Source

open well

Installation Type

new

Well Depth (m)

6.1

Water Depth (m)

1.1

Pump Length (m)

5.9

Dist. from Furthest Household (m)

200

No. of People Served

180

Pump Dedication / Donor

Alexander Sheridan,
Virginia Road Station, Co. Meath, Ireland