Pump installation in full swing

10th December 2014:

PUMP INSTALLATION PROGRAMME:

DATE              AREA TO BE INSTALLED
10.12.2014   Sonda 4
11.12.2014   Nkhata-bay 7
12.12.2014   Nkhata-bay 9
13.12.2014   Muyoka 3

Today they were in Sonda.
This is one of the pumps.

GPS
S 11 27.723
E o33 58.436

Village Headman: Kampeya
Number of people :

125

Looks like they finished very late and they have a long run to Nkhata-Bay tomorrow.
They are looking like the A Team.

All pumps in memory of Neil Carley RIP