Subscribe to our mailing list

e-mail Format

Pump Installation – Wells for Zoë
25245
page-template-default,page,page-id-25245,woocommerce-no-js,ajax_fade,page_not_loaded,,select-theme-ver-4.5,side_area_uncovered,wpb-js-composer js-comp-ver-5.5.2,vc_responsive

Kamtepa

Kahelele is in Edingeni. It is their first time to have our pump installed in this area. People are very interested to see how our pump works. They are requesting for more pumps in the village because the area is very big. They are also interested to grow more trees in the area so they are asking for tree seeds.

Date of Installation

2018-04-30

Area

Kahelele

District

Mzimba

GPS

-12.034606, 33.425536     see on map

Pump no.

18078

Dist. from Factory (km)

147

Village Head / Group Village Head

Chimutu

Contact (phone no.)

none

Previous Water Source

open well

Installation Type

new

Well Depth (m)

9.2

Water Depth (m)

1.1

Pump Length (m)

9

Dist. from Furthest Household (m)

129

No. of People Served

261

Pump Dedication / Donor

Wells for Zoë Donor TBC