Subscribe to our mailing list

e-mail Format

Pump Installation – Wells for Zoë
25245
page-template-default,page,page-id-25245,woocommerce-no-js,ajax_fade,page_not_loaded,,select-theme-ver-4.4,side_area_uncovered,wpb-js-composer js-comp-ver-5.4.7,vc_responsive

Silia

Pump 18D4D002

We installed a pump in the area five years ago, but in 2017 the well collapsed due to heavy rains. As people were used to drinking safe and clean water from a pump, they decided to dig another well and reported to our office to ask for assistance to install another pump for them. Without hesitation, we again went there and installed a pump. Now they are happy again as they will be drinking safe and clean water. Still more they are asking seeds to start planting trees. They wish WfZ all the best. 

The pictures show the pump installation team on their way to install the pump and the previous source of water for the villagers.

Date of Installation

2018-04-19

Area

Silia

District

Mzimba

GPS

-11.523880, 33.902500     see on map

Pump no.

184002

Dist. from Factory (km)

27

Village Head / Group Village Head

Panganani

Contact (phone no.)

888030374

Previous Water Source

open well

Installation Type

new

Well Depth (m)

4.3

Water Depth (m)

3.9

Pump Length (m)

4.1

Dist. from Furthest Household (m)

950

No. of People Served

226

Pump Dedication / Donor

1D Fans Give, 'Work Hard, Pray Hard, be Kind',
UK