Subscribe to our mailing list

e-mail Format

On track to have 500 pumps installed this year – Wells for Zoë
26144
post-template-default,single,single-post,postid-26144,single-format-standard,ajax_fade,page_not_loaded,,select-theme-ver-4.2,side_area_uncovered,wpb-js-composer js-comp-ver-5.4.4,vc_responsive

On track to have 500 pumps installed this year

Here we have Chrissie working the chop saw.  She’s holding the fort for the boys and making sure the show is still on the road. We are on track to  having 500 pumps installed by the end of 2017, bringing clean and safe drinking water to rural villages in the northern region of Malawi.

Five pumps were installed on Monday in the Chendesi area, bringing the total number of pumps installed so far this year to 403. Chrissie works in the workshop making the pumps, but is also responsible for all of the pump administration, including stock-taking!

Tags:
No Comments

Post a Comment